chore: sync upstream (89 Commits) #12
No reviewers
Labels
No labels
herkunft/alpha-feedback
status
blockiert
status
zu-testen
typ
bug
typ
docs
typ
enhancement
typ
feature
typ
idea
No milestone
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Dependencies
No dependencies set.
Reference
iris/effectcraft!12
Loading…
Add table
Add a link
Reference in a new issue
No description provided.
Delete branch "chore/sync-upstream-20261027"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Upstream-Sync von
upstream/main(89 Commits). Fast-Forward.dd12ed8fMerge pull request #2518 from Silvertree2010/perf/export-speed94399e62Pin movie export bytesdb41fa79Skip transparent pixels and quantise while compositingd8bca3cdOverlap movie encoding with renderingbc4b48f6fix(ui): dropdown menus grow back after a search with no matches (#2511)01c904b0Merge pull request #2491 from aiongg/layoutcca8ce06Merge pull request #2487 from storytold/fix/nextest-0.9.150b7b75ed3style: cargo fmt on the moved files3e38bd73refactor(pdf): split the PostScript interpreter ps.rs into ps/*.rs5cb74259refactor(effects): split ocio.rs into ocio/*.rs13fe6e5crefactor(effects): split sim.rs into sim/*.rs67ef9ad9refactor(effects): split sim2.rs into sim2/*.rsb05467e4refactor(effects): split generate3.rs into generate3/*.rsf5f51f8drefactor(ui-egui): move viewer frame, geometry, gestures, shapes, tools and view parts to panels/viewer/*.rs9b52c71arefactor(ui-egui): move viewer tests to panels/viewer/tests.rs